Предмет: Английский язык Тема теста: The life cycle of system development Класс: 11 Тип вопросов: Единственный выбор Количество вопросов: 9 Выводить тест с ответами: Да

Test: The life cycle of system development

  1. Which phase of the System Development Life Cycle focuses on gathering user requirements and stakeholder needs? A) Design B) Requirements Analysis C) Coding D) Testing Answer: B

  2. In the Waterfall model, what best describes its progression? A) Iterative cycles with frequent changes B) A fixed sequence of stages with little backtracking C) Emphasis on rapid prototyping D) Continuous deployment and feedback Answer: B

  3. Which SDLC model emphasizes working in short iterations, customer collaboration, and flexibility? A) Waterfall B) V-Model C) Agile D) Spiral Answer: C

  4. The purpose of the Testing phase is to: A) Write requirements B) Verify and validate that the system meets requirements C) Deploy to production D) Maintain code Answer: B

  5. What document usually describes the overall system architecture and design? A) User Manual B) Architectural Design Document C) Test Plan D) Maintenance Plan Answer: B

  6. In the V-Model, each development activity has a corresponding testing activity. A) True B) False Answer: A

  7. Which model uses risk-driven spiral cycles with planning, risk analysis, engineering, and evaluation? A) Spiral model B) Waterfall C) Scrum D) RAD Answer: A

  8. Which phase includes activities like database design, module interfaces, and UI layout? A) Implementation B) Maintenance C) Design D) Requirements Answer: C

  9. What does the Maintenance phase involve? A) Recalling requirements B) Modifying the system to fix defects and adapt to changes after deployment C) Only testing D) Initial planning Answer: B

Answer key: 1-B, 2-B, 3-C, 4-B, 5-B, 6-A, 7-A, 8-C, 9-B